combined 450 bhp condensing gas boiler

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :combined 450 bhp condensing gas boiler
  • Supply Capacity : 10 units/month :combined 450 bhp condensing gas boiler
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

Get display discount

Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • Frequently Asked Questions – EnergyPro

    If the same boiler is used for radiant floors and domestic hot water, model the boiler in the DHW tab and at the System level of the tree select 'DHW boiler provides heat'. Sample file located in My DocumentsEnergyPro xProjectsLow-rise Combined Hydronic.bld. It may be the case that there is a dedicated boiler for radiant heat.Get Price

  • Compre Special Project (PPE &IPE) | PDF | Boiler | Thermal

    A heat exchanger was installed purposely to cool 0.50 kg of gas per second. Molecular weight is 28 and k=1.32. The gas is cooled from 150 C to 80 C. Water is available at the rate of 0.30 kg/s and at a temperature of 12 C. Calculate the exit temperature of the water.Get Price

  • Compre Special Project (ppe &ipe) [vnd5gjm03rlx]

    Steam at the rate of 70,000 kg/hr from the boiler drum enters the superheater inlet header at 8.3 Mpa and 485oC. Combustion products at 980oC enters the superheater proper at the rate of 160,000kg/hr. Superheater elements are made of 60 mm O.D. by 8 mm thick tubing of 30 m length. Assume that the flue gas has the same thermal properties of air.Get Price

  • Frequently Asked Questions – EnergyPro

    If the same boiler is used for radiant floors and domestic hot water, model the boiler in the DHW tab and at the System level of the tree select 'DHW boiler provides heat'. Sample file located in My DocumentsEnergyPro xProjectsLow-rise Combined Hydronic.bld. It may be the case that there is a dedicated boiler for radiant heat.Get Price

  • Combustion Evaluation: Sources and Control Devices

    The available heat for the boiler at 500°F and theoretical combustion equals 9, 150,000 BTU per hour. If 20 percent excess combustion air was used, the available heat at 500°F would be decreased to about 79 percent of the gross heating value for natural gas (calculated from Figure 4).Get Price

  • PIPE ALBORBOR RAINBOW BOOK (CP) | PDF | Heat | Heat Transfer

    The factor of evaporation is 1.3 boiler rating is 200%, boiler efficiency is 65% heating surface area is 0.91 m^3 per bo.Hp, and the heating value of fuel is 18,400 Kcal/kg. the total coal available in the bunker is 50,000 kg. determine the no, of hrs to consume the available fuel. A. 853.36 hrs B. 706.57 hrs C. 979.46 hrs D. 100.75 hrsGet Price

  • Compre Special Project (PPE &IPE) | PDF | Boiler | Thermal

    A heat exchanger was installed purposely to cool 0.50 kg of gas per second. Molecular weight is 28 and k=1.32. The gas is cooled from 150 C to 80 C. Water is available at the rate of 0.30 kg/s and at a temperature of 12 C. Calculate the exit temperature of the water.Get Price

  • Chapter 4: [CE] Commercial Energy Efficiency, 2020 Energy

    Boiler systems with design input of greater than 1,000,000 Btu/h (293 kW) shall comply with the turndown ratio specified in Table C403.3.4. The system turndown requirement shall be met through the use of multiple single-input boilers, one or more modulating boilers or a combination of single-input and modulating boilers. TABLE C403.3.4. BOILER Get Price

  • Chapter 4: [CE] Commercial Energy Efficiency, 2020 Energy

    Boiler systems with design input of greater than 1,000,000 Btu/h (293 kW) shall comply with the turndown ratio specified in Table C403.3.4. The system turndown requirement shall be met through the use of multiple single-input boilers, one or more modulating boilers or a combination of single-input and modulating boilers. TABLE C403.3.4. BOILER Get Price

  • PIPE ALBORBOR RAINBOW BOOK (CP) | PDF | Heat | Heat Transfer

    The factor of evaporation is 1.3 boiler rating is 200%, boiler efficiency is 65% heating surface area is 0.91 m^3 per bo.Hp, and the heating value of fuel is 18,400 Kcal/kg. the total coal available in the bunker is 50,000 kg. determine the no, of hrs to consume the available fuel. A. 853.36 hrs B. 706.57 hrs C. 979.46 hrs D. 100.75 hrsGet Price

  • Chapter 4: [CE] Commercial Energy Efficiency, 2020 Energy

    Boiler systems with design input of greater than 1,000,000 Btu/h (293 kW) shall comply with the turndown ratio specified in Table C403.3.4. The system turndown requirement shall be met through the use of multiple single-input boilers, one or more modulating boilers or a combination of single-input and modulating boilers. TABLE C403.3.4. BOILER Get Price

  • Compre Special Project (PPE &IPE) | PDF | Boiler | Thermal

    A heat exchanger was installed purposely to cool 0.50 kg of gas per second. Molecular weight is 28 and k=1.32. The gas is cooled from 150 C to 80 C. Water is available at the rate of 0.30 kg/s and at a temperature of 12 C. Calculate the exit temperature of the water.Get Price

  • Compre Special Project (ppe &ipe) [vnd5gjm03rlx]

    Steam at the rate of 70,000 kg/hr from the boiler drum enters the superheater inlet header at 8.3 Mpa and 485oC. Combustion products at 980oC enters the superheater proper at the rate of 160,000kg/hr. Superheater elements are made of 60 mm O.D. by 8 mm thick tubing of 30 m length. Assume that the flue gas has the same thermal properties of air.Get Price

  • PIPE ALBORBOR RAINBOW BOOK (CP) | PDF | Heat | Heat Transfer

    The factor of evaporation is 1.3 boiler rating is 200%, boiler efficiency is 65% heating surface area is 0.91 m^3 per bo.Hp, and the heating value of fuel is 18,400 Kcal/kg. the total coal available in the bunker is 50,000 kg. determine the no, of hrs to consume the available fuel. A. 853.36 hrs B. 706.57 hrs C. 979.46 hrs D. 100.75 hrsGet Price

  • Combustion Evaluation: Sources and Control Devices

    The available heat for the boiler at 500°F and theoretical combustion equals 9, 150,000 BTU per hour. If 20 percent excess combustion air was used, the available heat at 500°F would be decreased to about 79 percent of the gross heating value for natural gas (calculated from Figure 4).Get Price

  • Combustion Evaluation: Sources and Control Devices

    The available heat for the boiler at 500°F and theoretical combustion equals 9, 150,000 BTU per hour. If 20 percent excess combustion air was used, the available heat at 500°F would be decreased to about 79 percent of the gross heating value for natural gas (calculated from Figure 4).Get Price

  • Compre Special Project (ppe &ipe) [vnd5gjm03rlx]

    Steam at the rate of 70,000 kg/hr from the boiler drum enters the superheater inlet header at 8.3 Mpa and 485oC. Combustion products at 980oC enters the superheater proper at the rate of 160,000kg/hr. Superheater elements are made of 60 mm O.D. by 8 mm thick tubing of 30 m length. Assume that the flue gas has the same thermal properties of air.Get Price